Position: Project Design Manager
Salary: Negotiable
Recruitment Requirements:
Bilingual Proficiency: Fluent in both Mandarin Chinese and English
Regional Experience: Proven design experience in the UAE
Position: Design Deputy Manager
Key Responsibilities:
Design Process Management
Develop and maintain the project’s design workflow diagram.
Ensure full compliance with UAE and Sharjah real-estate development design regulations.
Design Risk Assessment
Identify and evaluate potential risks throughout the design phase.
Propose risk management strategies and prepare detailed mitigation plans.
Design Cost Optimization
Meet all functional requirements while exploring alternative design solutions.
Implement cost‐effective design options to reduce overall construction expenditure.
Effective Communication Mechanism
Establish and sustain clear communication channels with design subcontractors, local authorities, client supervision teams, and internal technical, construction, and procurement departments.
Convene regular coordination meetings to preempt and resolve design‐related issues.
Participation in Subcontract Negotiations
Provide required technical, material, and equipment specifications during the design phase.
Conduct resource gathering and market research; actively engage in negotiation sessions.
Design Milestone Control
Ensure all design deliverables adhere to deadlines stipulated in client and subcontract agreements.
Support the acquisition of necessary construction permits tied to design approvals.
薪酬:面議
招聘要求:
雙語能力:流利使用普通話和英語
區(qū)域經(jīng)驗:在阿聯(lián)酋有 proven 的設(shè)計經(jīng)驗
職位:設(shè)計副經(jīng)理
工作年限:8年及以上相關(guān)工作經(jīng)驗
主要職責(zé):
設(shè)計流程管理:
制定并維護項目的設(shè)計工作流程圖。
確保完全符合阿聯(lián)酋和 Sharjah 房地產(chǎn)開發(fā)設(shè)計規(guī)定。
設(shè)計風(fēng)險評估:
在整個設(shè)計階段識別和評估潛在風(fēng)險。
提出風(fēng)險管理策略并準(zhǔn)備詳細(xì)的緩解計劃。
設(shè)計成本優(yōu)化:
滿足所有功能要求的同時探索替代設(shè)計方案。
實施效益高的設(shè)計方案以減少整體建設(shè)支出。
建立有效的溝通機制:
建立并維持與設(shè)計分包商、當(dāng)?shù)禺?dāng)局、客戶監(jiān)督團隊以及內(nèi)部技術(shù)、施工和采購部門之間的清晰溝通渠道。
定期召開協(xié)調(diào)會議以預(yù)防和解決設(shè)計相關(guān)問題。
參與分包談判:
在設(shè)計階段提供所需的技術(shù)、材料和設(shè)備規(guī)格。
進行資源收集和市場研究;積極參與談判會。
設(shè)計里程碑控制:
確保所有設(shè)計交付物符合客戶和分包合同中規(guī)定的截止日期。
支持獲取與設(shè)計批準(zhǔn)相關(guān)的必要建設(shè)許可。